Showing posts with label Consumption-based Planning. Show all posts
Showing posts with label Consumption-based Planning. Show all posts

Friday, May 8, 2015

Consumption-based planning and MRP

MRP and Consumption-based planning are two fundamental SAP planning types that can be used to determine a product’s requirements. To avoid any confusion we not referring to the MRP run that is executed through MD01 and MD02. We are referring to planning types that are set in the Material Master’s MRP1 tab. The MRP type is used in the MRP run to determine HOW procurement and/or production quantities are calculated.